March 24, 2021 +
Cottage Lake Elementary
This new 35,000 square foot classroom and library building for the Northshore School District emphasizes a number of green design elements . The wood and steel framed structure was designed to incorporate many floor and roof penetrations for the distribution of natural… Read More
March 24, 2021 +
Greenbridge Early Learning Center
This 30,000 SF project houses facilities for child development, health, and family support services in Seattle’s Greenbridge community. The structure features a combination of wood and steel framing over a post-tensioned slab with pile-supported shoring walls and 15,000 SF of parking space… Read More
March 24, 2021 +
Shoreline Community College – Faculty Office and Student Services (FOSS) Building Entry Replacement
An assessment of structural deterioration of the aging exterior access ramps at the FOSS Building was conducted; results determined repairs costs to maintain the existing structure would be significant. Based on our recommendations, the College chose to replace the entry with a… Read More
March 24, 2021 +
Peninsula Community College Wellness Center
Peninsula Community College’s new wellness center is an addition to the existing gymnasium. The single-story structure features an up-to-date weight room and cardio lab. The facility provides improved, covered entry to the existing gymnasium. Wood frame construction with brick veneer blends with… Read More
March 24, 2021 +
Kingsgate Library System Branch Renovation Study
Lund Opsahl provided a structural and seismic evaluation and strengthening of this 1970s wood framed structure.
March 24, 2021 +
Orcas Island Public Library Expansion
Located in the San Juan Islands, the Orcas Island Public Library expansion doubled the occupied space of the existing library. The superstructure of the building was designed to appear as a continuation of the existing building, matching similar structural materials and detailing…. Read More
March 24, 2021 +
Clover Park Technical College
Clover Park Technical College elected to complete voluntary seismic upgrades and renovations to a 10,000 SF timber framed, barrel-vault aviation hangar built in 1931, currently used as a wood shop. In addition to the upgrades, Lund Opsahl provided structural engineering services for… Read More
March 24, 2021 +
Harborview Medical Center Cart Washers and Sterilizers
This design-build project included equipment replacements in the Central Sterile Department. Structural modifications addressed the need to add floor depressions to accommodate the new cart washer. The installation of the cartwash unit required reconstruction of a reinforced, concrete floor slab for the… Read More
March 24, 2021 +
Museum of Flight Construction Engineering
Lund Opsahl provided an analysis, structural calculations, and reviewed plans for compliance and additional bracing to support the Museum of Flight’s Hangar Erection Plan.
March 24, 2021 +
Tilt 49 Construction Engineering
Lund Opsahl was hired to provide construction support for a large residential and office project in a tight, urban site in the Denny Triangle. One of the more challenging aspects was a pile supported tower crane foundation. Due to site restrictions, the… Read More